subject
Mathematics, 08.04.2021 08:30 kiararoman1715

Steel Company manufactures two kinds of wrought-iron rails: Model E (the elegant) and Model D (the distinctive). Model E rails sell for $59 and cost $50 to make, whereas Model
D rails sell for $48 and cost $41 to make. To make one Model E rail requires 2 hours on
Machine A, 1 hour on Machine B, and 4 hours on Machine C. On the other hand, to make
one Model D rail requires 1 hour on A, 2 hours on B, and 5 hours on C. Production
scheduling indicates that during the coming week Machine A will be available for at most
30 hours, Machine B for at most 24 hours, and Machine C for at most 72 hours. Find the
number of each kind of rail to be made in the coming week in order for the company to
maximize its profit. Calculate the maximum profit.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:40, hma9153
Match each function with the corresponding function formula when h(x)=5-3x and g(x)=-3+5
Answers: 1
image
Mathematics, 21.06.2019 19:50, leximae2186
The graph shows the distance kerri drives on a trip. what is kerri's speed?
Answers: 3
image
Mathematics, 21.06.2019 23:30, fonzocoronado3478
Answer each of the questions for the following diagram: 1. what type of angles are these? 2. solve for x. what does x equal? 3. what is the measure of the angles?
Answers: 1
image
Mathematics, 21.06.2019 23:40, haybales6019
Cos^2x+cos^2(120°+x)+cos^2(120°-x)i need this asap. pls me
Answers: 1
You know the right answer?
Steel Company manufactures two kinds of wrought-iron rails: Model E (the elegant) and Model D (the...

Questions in other subjects:

Konu
Health, 15.01.2021 19:30
Konu
Mathematics, 15.01.2021 19:30