Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging
help/
Answers: 2
Mathematics, 21.06.2019 19:10, brainewashed11123
Which of the following is the shape of a cross section of the figure shown below
Answers: 3
Mathematics, 21.06.2019 21:40, Blakemiller2020
Which of the following best describes the graph below? + + 2 + 3 + 4 1 o a. it is not a function. o b. it is a one-to-one function. o c. it is a many-to-one function. o d. it is a function, but it is not one-to-one.
Answers: 3
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Mathematics, 18.10.2021 22:30
Biology, 18.10.2021 22:30
Physics, 18.10.2021 22:30
History, 18.10.2021 22:30
Mathematics, 18.10.2021 22:30
Mathematics, 18.10.2021 22:30