subject
Mathematics, 25.03.2021 21:10 aek02

The operations manager at a brewery that runs 24 hours per day wants to investigate the amount of production time lost each day (24-hour period) due to equipment failure. Historically, the population mean amount of lost time has been assumed to be 3.4 hours per day. The manager feels that due to aging equipment, the population mean is now greater than 3.4 hours per day. The manager decides to test his claim. Over the next 2 months, the sample of 30 days results in an average amount of lost time 3.92 hours per day with a sample standard deviation 1.4 hours. What would be the conclusions that we can draw for the test described above based on these sample results?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:10, evalentine843
Olivia uses the work below to determine 55% of 720 which explains the error in olivia’s solution
Answers: 1
image
Mathematics, 21.06.2019 15:30, makaylahendrix7954
Mary works for a company that ships packages and must measure the size of each box that needs to be shipped. mary measures a box and finds the length is 7 inches, the width is 14 inches, and the height is 15 inches. what is the volume of the box? [type your answer as a number.]
Answers: 1
image
Mathematics, 21.06.2019 20:30, GILLIG6003
This is about circle theorems. someone asap : (
Answers: 1
image
Mathematics, 22.06.2019 00:30, sjamelia
Write the factored form of this trinomial 9x^2+18x-7
Answers: 3
You know the right answer?
The operations manager at a brewery that runs 24 hours per day wants to investigate the amount of pr...

Questions in other subjects:

Konu
Chemistry, 24.05.2021 23:00
Konu
English, 24.05.2021 23:00
Konu
Mathematics, 24.05.2021 23:00