subject
Mathematics, 24.03.2021 20:40 kaitlynbrace9742

Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. If required, enter negative values as negative numbers.
a. Select a scatter diagram with the line speed as the independent variable.
b. What does the scatter diagram developed in part (a) indicate about the relationship between the two variables?
c. Use the least squares method to develop the estimated regression equation (to 1 decimal). = + x d. Predict the number of defective parts found for a line speed of 25 feet per minute.
Line Speed Number of Defective Parts Found
20 23
20 21
30 19
30 16
40 15
40 17
50 14
50 11

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, cecelia090
Any is very appreciated! (picture is provided below)not sure how to do this at all won't lie
Answers: 1
image
Mathematics, 21.06.2019 18:30, pacerskora
Write an algebraic expression to match each statement a. four less than 8 times a number b. twice the difference of a number and six c. nine from a number squared
Answers: 1
image
Mathematics, 21.06.2019 18:50, xlebrny1215
Which translation maps the vertex of the graph of the function f(x) = x2 onto the vertex of the function g(x) = x2 – 10x +2?
Answers: 1
image
Mathematics, 21.06.2019 20:30, nsbegay2007
Tom is the deli manager at a grocery store. he needs to schedule employee to staff the deli department for no more that 260 person-hours per week. tom has one part-time employee who works 20 person-hours per week. each full-time employee works 40 person-hours per week. write and inequality to determine n, the number of full-time employees tom may schedule, so that his employees work on more than 260 person-hours per week. graph the solution set to this inequality.
Answers: 2
You know the right answer?
Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastic...

Questions in other subjects:

Konu
History, 05.05.2020 00:17
Konu
History, 05.05.2020 00:17