subject
Mathematics, 23.03.2021 20:20 Adithya27

a water well drilling rig can dig -60 feet after one full day. (24 hours) of continuous use. if the rig has been running constantly and is currently at a height of -143.6 feet, for how long has the rig been running?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, theodoredenetz8316
Adifferent website gives the cost for the first train as £56.88 and the second train as £20.11 with a £9.50 charge for cycle storage for the whole trip. how much would the journey cost you?
Answers: 1
image
Mathematics, 21.06.2019 21:30, amandaaaa13
Find the ratios of the corresponding sides
Answers: 2
image
Mathematics, 22.06.2019 01:30, Jharsh2300
Urgent need asap △abc is similar to △xyz. also, side ab measures 6 cm, side bc measures 18 cm, and side xy measures 12 cm. what is the measure of side yz ? enter your answer in the box.
Answers: 1
image
Mathematics, 22.06.2019 01:30, mparra4761
Aresearch study is done to find the average age of all u. s. factory workers. the researchers asked every factory worker in ohio what their birth year is. this research is an example of a census survey convenience sample simple random sample
Answers: 2
You know the right answer?
a water well drilling rig can dig -60 feet after one full day. (24 hours) of continuous use. if the...

Questions in other subjects:

Konu
Arts, 26.01.2021 18:20