subject
Mathematics, 22.03.2021 21:20 vlonejd43

Quality control engineers create acceptable boundaries for variability within the processes they monitor. They determine that the acceptable boundary for a certain heat exchange process at a gasoline refinery must be set such that under normal operating conditions the threshold would be exceeded only 1% of the time. Under normal operating conditions, the process varies according to a normal distribution, with mean temperature of 231°C and standard deviation of 2.5°C. What upper temperature should they set so that the process will normally exceed the temperature 0.51% of the time?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, owlgirl554
Segment xz is bisected by point y. if xy = 12x, and the measure of xz = 18x – 6, solve for x
Answers: 1
image
Mathematics, 21.06.2019 23:00, zykia1002
Janie has $3. she earns $1.20 for each chore she does and can do fractions of chores. she wants to earn enough money to buy a cd for $13.50.
Answers: 1
image
Mathematics, 21.06.2019 23:40, ozzypurple05
For a function f(x), a) if f(7) = 22 then f^-1(22) = b) f^-1(f(c)) =
Answers: 2
image
Mathematics, 22.06.2019 00:00, Satoetoe24
The cost of a taxi ride includes an initial charge of $2.00. if a 5km ride cost $6.00 and a 10km ride cost $10.00, determine the cost of a 15km ride.
Answers: 1
You know the right answer?
Quality control engineers create acceptable boundaries for variability within the processes they mon...

Questions in other subjects:

Konu
Computers and Technology, 05.01.2021 21:10
Konu
Mathematics, 05.01.2021 21:10