subject
Mathematics, 20.03.2021 08:00 abbiiee

HELP ME (no links)


HELP MEEEEEE (no links)

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, makk60
An airplane consumes fuel at a constant rate while flying through clear skies, and it consumes fuel at a rate of 64 gallons per minute while flying through rain clouds. let c represent the number of minutes the plane can fly through clear skies and r represent the number of minutes the plane can fly through rain clouds without consuming all of its fuel. 56c+64r < 900056c+64r< 9000 according to the inequality, at what rate does the airplane consume fuel while flying through clear skies, and how much fuel does it have before takeoff? the airplane consumes fuel at a rate of gallons per minute while flying through clear skies, and it has gallons of fuel before takeoff. does the airplane have enough fuel to fly for 60 minutes through clear skies and 90 minutes through rain clouds?
Answers: 3
image
Mathematics, 21.06.2019 17:30, cocothunder635
The manufacturer of a new product developed the following expression to predict the monthly profit, in thousands of dollars, from sales of the productwhen it is sold at a unit price of x dollars.-0.5x^2 + 22x - 224what is represented by the zero(s) of the expression? a. the profit when the unit price is equal to 0b. the unit price(s) when the profit is equal to 0c. the profit when the unit price is greatestd. the unit price(s) when profit is greatest
Answers: 3
image
Mathematics, 21.06.2019 20:20, SESDMANS9698
Select the correct answer from each drop-down menu. the length of a rectangle is 5 inches more than its width. the area of the rectangle is 50 square inches. the quadratic equation that represents this situation is the length of the rectangle is inches.
Answers: 1
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
HELP ME (no links)
...

Questions in other subjects:

Konu
Mathematics, 12.04.2021 04:00