subject
Mathematics, 20.03.2021 01:00 jenisimonsow6ddf

Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?​

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, dianaherrera041
The composite figure is made up of a parallelogram and a rectangle. find the area. a. 76 sq. units b. 48 sq. units c. 124 sq. units d. 28 sq. units
Answers: 1
image
Mathematics, 21.06.2019 23:00, kobiemajak
Jim had 3,067.48 in his checking account he wrote a check to pay for two airplane tickets. his account now has 1,845.24.
Answers: 1
image
Mathematics, 22.06.2019 00:00, minecraftsam2018
What is the effect on the graph of the function f(x) = x2 when f(x) is changed to f(x) − 4?
Answers: 1
image
Mathematics, 22.06.2019 02:00, lol9691
Find the distance of the blue line between the two labeled points. round to the nearest hundredth. a) 7.07 b) 7.21 c) 10 d) 5.12
Answers: 3
You know the right answer?
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...

Questions in other subjects:

Konu
Mathematics, 26.08.2020 01:01
Konu
Mathematics, 26.08.2020 01:01