Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned to the team that is developing the process design for producing an RFID sensor. The corporate planning group in San Jose, California has contacted her and has asked how confident the design group is about completing the project in 60 days. She has developed these estimated time durations in days for the project: ActivityImmediate Predecessor ActivitiesOptimistic TimeMost Likely TimePessimistic Time
A-101215
BA61014
CA101520
DA9918
EB568
FC, E101213
GB121416
HB, D182124
IB, D101520
JF, G,H81014
A) Determine the expected duration of the project.
B) What is the critical path?
C) Using the path determined above, what is the probability that the project will take longer than 56 days to complete?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, Packergood
34 cup. a serving of vegetable soup is 23 cup. the restaurant sold 20 servings of chicken noodle soup and 18 servings of vegetable soup. how many more cups of chicken noodle soup did they sell than cups of vegetable soup?
Answers: 2
image
Mathematics, 21.06.2019 17:00, drea445
The sum of the reciprocal of a positive number and the reciprocal of 2 more than the number is 3/4 equation: the number is
Answers: 2
image
Mathematics, 21.06.2019 20:30, lunax7x7
Astore ordered 750 candles a total wholesale cost of $7910.20. the soy candles cosy $12.17 each and thespecialty candles cost $9.58each. how many of each were bought?
Answers: 1
image
Mathematics, 21.06.2019 22:40, anastasiasam1916
(10. in the figure, a aabc is drawn tocircumscribe a circle of radius 3 cm ,such thatthe segments bd and dc are respectively oflength 6 cm and 9 cm. find the length ofsides ab and ac.
Answers: 3
You know the right answer?
Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned...

Questions in other subjects:

Konu
Health, 18.10.2019 06:30