Mathematics, 18.03.2021 21:10 orlando19882000
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Answers: 3
Mathematics, 21.06.2019 14:30, naenae6775
Acable company wants to provide cell phone service for residents on an island. the function for the cost of laying the cable from the island to the mainland is c(x)= 6.500 square root x2+4, where x represents the length of the cable in feet. what are the domain and range of the function? a) domain: all real numbers range: all real numbers greater than or equal to 17,000 b) domain: all real numbers greater than or equal to 0 range: all real numbers greater than or equal to 17,000 c) domain: all real numbers greater than or equal to 0 range: all real numbers greater than or equal to 13,000 d) domain: all real numbers greater than or equal to 13,000 range: all real numbers greater than or equal to 0
Answers: 3
Mathematics, 21.06.2019 16:00, alannismichelle9
In the diagram, the ratio of ab to ae is (1/2) . what is the ratio of the length of to the length of ?
Answers: 3
Mathematics, 21.06.2019 21:30, Joejoe1813
Due to bad planning, two of the local schools have their annual plays on the same weekend. while 457 people attend one, and 372 attend the other, only 104 people were able to attend both. how many people went to at least one play?
Answers: 1
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
English, 03.02.2021 06:20
Mathematics, 03.02.2021 06:20
Spanish, 03.02.2021 06:20
Mathematics, 03.02.2021 06:20