subject
Mathematics, 17.03.2021 23:50 jones2279

A factory process requires 3 steps to finish a product. The steps each have a mean completion time of pl = 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is independent
from the other steps. Let T be the total completion time of the 3 steps on a randomly chosen product
Find the mean of T.
UT =
seconds

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, thompsonmark0616
What is the value of x in the equation 2(x-4) = 4(2x + 1)?
Answers: 1
image
Mathematics, 21.06.2019 18:30, andrewmena05
Kayla wants to find the width, ab, of a river. she walks along the edge of the river 65 ft and marks point c. then she walks 25 ft further and marks point d. she turns 90° and walks until her location, point a, and point c are collinear. she marks point e at this location, as shown. (a) can kayla conclude that δ and δ are similar? why or why not? (b) suppose de = 15 ft. what can kayla conclude about the width of the river?
Answers: 2
image
Mathematics, 22.06.2019 00:30, ashleypaz15
What is the perimeter of an isosceles triangle with each leg measuring 2x+3 and the base measuring 6x-2?
Answers: 1
image
Mathematics, 22.06.2019 04:00, lilque3448
Yesi's dog weighed 5 pounds when she got him. he now yesi's dog weighed 5 pounds when she got him. he now weighs 45 pounds. how much did yesi's dog gain, in ounces?
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...

Questions in other subjects: