Mathematics, 04.03.2021 22:40 Raymond123
A four-lane freeway (two lanes in each direction) is located on rolling terrain and has 12-ft lanes, no lateral obstructions within 6 ft of the pavement edges, and there are two ramps within three miles upstream of the segment midpoint and three ramps within three miles downstream of the segment midpoint. The traffic stream consists of cars, buses, and large trucks (no recreational vehicles). A weekday directional peak-hour volume of 1800 vehicles (familiar users) is observed, with 700 arriving in the most congested 15-min period. a) If a level of service no worse than C is desired, determine the maximum number of large trucks and buses that can be present in the peak-hour traffic stream. b) If 180 of the 1800 vehicles observed in the peak hour were large trucks and buses, what would the level of service of this freeway be on a 5-mi, 6% downgrade
Answers: 3
Mathematics, 21.06.2019 17:30, sabrinarasull1pe6s61
Find the zero function by factoring (try to show work) h(x)=-x^2-6x-9
Answers: 2
Mathematics, 21.06.2019 22:30, kpopqueen0
Will mark brainlist what is the slope of the line passing through the points (-2, -8) and (-3,-9)? -7/5-5/71-1
Answers: 2
A four-lane freeway (two lanes in each direction) is located on rolling terrain and has 12-ft lanes,...
Mathematics, 03.06.2021 20:00
Mathematics, 03.06.2021 20:00
Mathematics, 03.06.2021 20:00
Mathematics, 03.06.2021 20:00
Mathematics, 03.06.2021 20:00
History, 03.06.2021 20:00