ou are the cost Engineer for a construction company in charge of building a new bridge. The construction company will be penalized each day of delay in construction for bridge. The penalty will be $4500 for the first day and will increase by $10000 for each following day. Based on its budget, the company can afford to pay a maximum of $ 175500 toward penalty. By modelling this as an arithmetic progression, findthe maximum number of days by which the completion of work can be delayed

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, kbuhvu
Which of the following equations is of the parabola whose vertex is at (2, 3), axis of symmetry parallel to the y-axis and p = 4? a.)y-3 = 1/16 (x-2)^2 b.)y+3 = -1/16 (x+2)^2 c.)x-2 = 1/16 (y-3)^2
Answers: 3
image
Mathematics, 21.06.2019 19:30, sofiisabella10
If you can solve all of these i will give ! - 4% of 190 - 4% of 162.5 - 4% of 140 - a 4% increase from 155.1 - a 4% increase from 159.8
Answers: 2
image
Mathematics, 21.06.2019 20:10, zay65307
Select the correct answer what is the most direct use of a compass in geometric constructions? a. to draw congruent angles b. to draw arcs of a given size c. to draw perpendicular lines d. to draw straight lines reset next next
Answers: 2
image
Mathematics, 22.06.2019 01:00, Kikilcaro4423
First work with stencil one. use a combination of reflections, rotations, and translations to see whether stencil one will overlap with the original pattern. list the sequence of rigid transformations you used in your attempt, noting the type of transformation, the direction, the coordinates, and the displacement
Answers: 3
You know the right answer?
ou are the cost Engineer for a construction company in charge of building a new bridge. The construc...