subject
Mathematics, 03.03.2021 01:00 imsatyam9365

A study by a geological research team said that a new piece of equipment designed for early earthquake detection is not effective
based on their recent study of 40 pieces of equipment they have
stationed near earthquake active zones with a = 0.05. However, the
manufacturer of the equipment claims this study was flawed and
their equipment is good. The research team is considering
rerunning the study with the intention of increasing the power of
this test. If the equipment really does detect earthquakes early,
which of the following would ensure an increase in the power of
the test?
(A) Move the equipment to three randomly chosen new locations.
(B) Change a = 0.05 to a = 0.02.
(C) Run a two-sided test instead of a one-sided test.
(D) Increase the sample size to 60 pieces of equipment being
tested.
(E) Decrease the sample size to 20 pieces of equipment being
tested.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, billy1123
For what value of x does 4x = (1/8) x + 5?
Answers: 1
image
Mathematics, 21.06.2019 20:20, rleiphart1
Which of the following values are in the range of the function graphed below? check all that apply ! - will give the answer "brainliest! "
Answers: 1
image
Mathematics, 21.06.2019 23:00, yash797
What’s the volume of the triangular prism?
Answers: 2
image
Mathematics, 22.06.2019 00:00, Talos02
Corresponding angles are a. always b. sometimes c. never congruent
Answers: 1
You know the right answer?
A study by a geological research team said that a new piece of equipment designed for early earthqu...

Questions in other subjects: