subject
Mathematics, 01.03.2021 15:20 SmallPepsiCan7260

Two different procedures have been proposed for assembling a new telephone set. The question is; is there a difference in the meantime to assemble the phone set. The first
procedure is (Procedure 1) and the second is (Procedure 2). To evaluate the two proposed

methods, it was decided to conduct a time and motion study. A sample of five employees was

timed using procedure 1 and six were timed using procedure 2. The results in minutes are shown below,

Procedure 1 (minutes) Procedure 2 (minutes)

P1 P2
2 3

4 7

9 5

3 8

2 4

3

Note: the last number (3) is under P2.
Is there a difference in the mean assembling times? alpha = 0.05​

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, TheOriginal2x
What is the arc length when θ =pi over 3 and the radius is 5 cm? (5 points) 5 pi over 3 cm 10 pi over 3 cm 16 pi over 3 cm pi over 3 cm
Answers: 1
image
Mathematics, 21.06.2019 20:30, anispotts
If a 36 inch yardstick casts a 21 foot shadow, how tall is a building whose shadow is 168 feet? what is the scale factor
Answers: 1
image
Mathematics, 22.06.2019 00:30, ericka79
What is the mean of the data set 125, 141, 213, 155, 281
Answers: 2
image
Mathematics, 22.06.2019 04:00, jamesgraham577
Which elements in the set are integers? –8, 3⁄4, √ 18 , 0, √ 16 , 5, –2⁄7, 6 a. –8, 0, 5, 6 b. –8, 0, √ 16 , 5, 6 c. 3⁄4, √ 18 , √ 16 , 5, –2⁄7 d. –8, 0, √ 18 , 5, 6
Answers: 1
You know the right answer?
Two different procedures have been proposed for assembling a new telephone set. The question is; is...

Questions in other subjects:

Konu
Physics, 08.10.2020 23:01
Konu
Mathematics, 08.10.2020 23:01