subject
Mathematics, 28.02.2021 16:50 bren04

A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope that weighs 0.6 kg/m. Initially the bucket contains 42 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 14-m level. Find the work done. Show how to approximate the required work by a Riemann sum.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, jessied2000
What is not true about kl and mn? what is mn? (show your work)
Answers: 1
image
Mathematics, 21.06.2019 18:30, narnia85
Write the slope-intercept form of the line that passes through the point (1, 0) and is parallel to x - y = 7. t
Answers: 2
image
Mathematics, 21.06.2019 21:00, jennybee12331
Louis wants to carpet the rectangular floor of his basement the basement has an area of 864 square feet the width of the basement is 2/3 its length what is the length of lewis's basement
Answers: 2
image
Mathematics, 22.06.2019 00:30, bossefamily1
Use the irregular polygon below. show all work. a. find the perimeter. b. find the area. the angles of the irregular polygon is 2, 8, 8, and 4.
Answers: 2
You know the right answer?
A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope t...

Questions in other subjects:

Konu
Mathematics, 06.03.2020 02:23