Mathematics, 22.02.2021 21:00 jkenkw4667
During construction the workers need to mix dried bentonite into the concrete as it is
being mixed to get the desired consistency. The workers decide to mix 800 mg of
Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The information for the
concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are
the workers within the desired range? (Note: 1kg = 2.2 lbs)
Answers: 2
Mathematics, 21.06.2019 20:30, girlygirl2007
Jason went to an arcade to play video games. he paid $2 for every 11 tokens he bought. he spent a total of $16 on tokens. which equation can be used to determine, t, the number lf tokens jason bought
Answers: 1
Mathematics, 21.06.2019 23:00, annnoe5128abc
Asporting good store is offering 30 percent off of the original price(x) of football cleats. the discount will be reduced by an another $7 before sales tax.
Answers: 1
During construction the workers need to mix dried bentonite into the concrete as it is
being mixed...
Mathematics, 01.09.2019 05:30
History, 01.09.2019 05:30
Mathematics, 01.09.2019 05:30
History, 01.09.2019 05:30
History, 01.09.2019 05:30