Solve y + 4.2 =-6.6.
A)y=-10.8
B) y=-2.4
C) y=2.4
D)...
Mathematics, 21.02.2021 14:00 Tioquino8089
Solve y + 4.2 =-6.6.
A)y=-10.8
B) y=-2.4
C) y=2.4
D)y= 10.8
Answers: 3
Mathematics, 21.06.2019 21:20, pampam49
An office supply company conducted a survey before marketing a new paper shredder designed for home use. in the survey, 80 % of the people who tried the shredder were satisfied with it. because of this high satisfaction rate, the company decided to market the new shredder. assume that 80 % of all people are satisfied with this shredder. during a certain month, 100 customers bought this shredder. find the probability that of these 100 customers, the number who are satisfied is 69 or fewer.
Answers: 2
Mathematics, 21.06.2019 21:30, Harriche
The perimeter of a rectangular lot of land is 436 ft. this includes an easement of x feet of uniform width inside the lot on which no building can be done. if the buildable area is 122 ft by 60 ft, determine the width of the easement. select one: a. 9 feet b. 18 feet c. 4.5 feet d. 7 feet
Answers: 3
Mathematics, 21.06.2019 23:10, skylar1315
Determine the required value of the missing probability to make the distribution a discrete probability distribution. x p(x) 3 0.23 4 ? 5 0.51 6 0.08 p(4) = nothing (type an integer or a decimal.)
Answers: 3
Business, 19.10.2020 05:01
English, 19.10.2020 05:01
History, 19.10.2020 05:01
Chemistry, 19.10.2020 05:01
English, 19.10.2020 05:01