Mathematics, 18.02.2021 23:20 hernandezbrandon059
When building a house, the number of days required to build is inversely roportional to with the number of workers. One house was built in 85 days by 5 workers. How many days would it take to build a similar house with 25 workers?
Answers: 2
Mathematics, 21.06.2019 17:00, TheOriginal2x
What is the arc length when θ =pi over 3 and the radius is 5 cm? (5 points) 5 pi over 3 cm 10 pi over 3 cm 16 pi over 3 cm pi over 3 cm
Answers: 1
Mathematics, 21.06.2019 18:30, letsbestupidcx7734
Two cyclists 84 miles apart start riding toward each other at the samen time. one cycles 2 times as fast as the other. if they meet 4 hours later what is the speed (in miles) of the faster cyclists
Answers: 2
Mathematics, 21.06.2019 20:00, claudia3776
What does the sign of the slope tell you about a line?
Answers: 2
When building a house, the number of days required to build is inversely roportional to with the num...