Mathematics, 16.02.2021 22:20 carlosleblanc26
An engineering company was hired to dig an underground tunnel directly from
B.
158 ft
point A to point B, which was a distance of 1.4
miles. By mistake, however, they
tunneled from point A to point C. Then they tunneled from point C to point B. If
tunneling costs about $120 million per mile, about how much money was wasted?
your answer. (Note: 1 mile = 5,280 feet.)
Show how
you
found
Answers: 2
Mathematics, 21.06.2019 13:30, daytonalive7193
Find the magnitude of the torque about p if an f = 80-lb force is applied as shown. (round your answer to the nearest whole number.) ft-lb
Answers: 1
Mathematics, 21.06.2019 16:30, bettybales1986
Phyllis and chen are saving money to go to a football game. each friend starts with some money and saves a specific amount each week. phyllis made a graph to show the total she has saved at the end of each week. chen wrote an equation to show the total, y, he has saved at the end of each week, x. y = 15x + 15 compare the amount that each friend has when both friends start saving. select the correct answer from the drop-down menu to complete the statement. phyllis starts with $ and chen starts with $
Answers: 1
An engineering company was hired to dig an underground tunnel directly from
B.
158 ft
p...
158 ft
p...
History, 09.10.2019 21:00
Mathematics, 09.10.2019 21:00
History, 09.10.2019 21:00
Mathematics, 09.10.2019 21:00