subject
Mathematics, 15.02.2021 21:50 payshencec21

A front-end loader is to load trucks with granular material that has a swell factor of 15%. If the loader has a heaped capacity of 10 cu. yd., calculate the total cycle time for the loader if it can move 55 cu. yd. of in-bank material in 1 hr. with an efficiency of 48 min./hr.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:40, demarcuswiseman
Is it true that product of 3 consecutive natural numbers is always divisible by 6? justifyyour answer
Answers: 2
image
Mathematics, 21.06.2019 20:50, george27212
Find the equation of a line that is perpendicular to line g that contains (p, q). coordinate plane with line g that passes through the points negative 3 comma 6 and 0 comma 5 3x − y = 3p − q 3x + y = q − 3p x − y = p − q x + y = q − p
Answers: 1
image
Mathematics, 21.06.2019 21:30, magicpuppydance
On #16 : explain how factoring a trinomial, ax^2+ bx+ c, when a does not equal 1 different from factoring a trinomial when a = 1.
Answers: 2
image
Mathematics, 21.06.2019 21:50, safiyyahrahman8937
Aparticular telephone number is used to receive both voice calls and fax messages. suppose that 25% of the incoming calls involve fax messages, and consider a sample of 25 incoming calls. (a) what is the expected number of calls among the 25 that involve a fax message?
Answers: 1
You know the right answer?
A front-end loader is to load trucks with granular material that has a swell factor of 15%. If the l...

Questions in other subjects:

Konu
Mathematics, 13.06.2020 23:57
Konu
Social Studies, 13.06.2020 23:57
Konu
Mathematics, 13.06.2020 23:57