Mathematics, 11.02.2021 22:00 Derrionna
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 3 hours to assemble and 1/2 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 30 per day, and the maximum number of painting hours available is 9 per day. (a) Write the system of inequalities that describes the constraints on the number of each type of wood chipper produced. (Let x represent the number of deluxe models, and let y represent the number of economy models.)
Answers: 2
Mathematics, 21.06.2019 14:50, Longjeremiahs8864
Question 101 points)which equation in slope-intercept form represents the line that passes through (5, 1) and(-4,7)
Answers: 1
Mathematics, 22.06.2019 00:30, OperatorBravo
Which equation represents h for right triangle abc
Answers: 1
Mathematics, 22.06.2019 02:30, oliviapolerop7209
Anne plans to increase the prices of all the items in her store by 5%. to the nearest cent, how much will an artist save if the artist buys a canvas and a frame that each measure 24 by 36 inches before the price increase goes into effect?
Answers: 1
Mathematics, 22.06.2019 03:30, texas101st78
Find the solution set for this equation: t^2+7t=0 separate the two values with a comma.
Answers: 2
The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requ...
Mathematics, 05.12.2020 01:10
English, 05.12.2020 01:10
English, 05.12.2020 01:10
English, 05.12.2020 01:10
History, 05.12.2020 01:10
Business, 05.12.2020 01:10
Mathematics, 05.12.2020 01:10