subject
Mathematics, 09.02.2021 21:20 savannadutton8577

Workers at a quarry are removing rock at a daily rate of 0.1%. There are 3.2 tons of rock when the work begins. Which function can be used to find the number of tons of rock left at the end of d days?
A. m(d) = 3.2(0.999)^d
B. m(d) = 3.2(0.99)^d
C. m(d) = 3.2(1.01)^d
D. m(d) = 3.2(1.001)^d

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, lel11
Barbara's piano instructors house is 7 1/8 miles from her house. after biking for 1 3/4 miles she stops to rest how much longer does she need to bike to reach her instructor's house
Answers: 1
image
Mathematics, 21.06.2019 17:00, safiyyahrahman6907
Can someone me i’m confused. will give brainliest and a whole bunch of points
Answers: 2
image
Mathematics, 21.06.2019 20:30, hrcatena
What is the slope of the line shown below?
Answers: 1
image
Mathematics, 21.06.2019 21:30, madisonsimmons1120
Mon wants to make 5 lbs of the sugar syrup. how much water and how much sugar does he need… …to make 5% syrup?
Answers: 2
You know the right answer?
Workers at a quarry are removing rock at a daily rate of 0.1%. There are 3.2 tons of rock when the w...

Questions in other subjects:

Konu
Mathematics, 17.09.2019 12:10