subject
Mathematics, 09.02.2021 04:50 sssudeegaming1943

Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete mix which has: cement = 1 partsand = 2 partsgravel = 3 parts How many cubic metres of gravel does Tony need? Question response area Select one option 0.5 1.0 1.5

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:30, helpmepls23
Steve had 48 chocolates but he decided to give 8 chocolats to each of his f coworkers. how many chocolates does steve have left
Answers: 1
image
Mathematics, 22.06.2019 00:00, madisonwr
Afarmer has decided to divide his land area in half in order to plant soy and corn. calculate the area of the entire area so he knows how much soil is needed. each bag of soil covers 20 square yards. how many bags should the farmer purchase? (4 points) 1 bag 2 bags 3 bags 4 bags
Answers: 2
image
Mathematics, 22.06.2019 00:30, lacourboud20005
You are riding your bike and notice the square sign above. you mentally draw a straight line from point a to c. describe the angle relationship between dca and bca
Answers: 1
image
Mathematics, 22.06.2019 04:00, ciarrap552
Suppose the equation of a line is 2x − 4y = − 8. which coordinate pair represents the y-intercept?
Answers: 2
You know the right answer?
Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete...

Questions in other subjects:

Konu
Biology, 19.05.2021 07:30
Konu
Mathematics, 19.05.2021 07:30