subject
Mathematics, 09.02.2021 04:50 kyeilahj

What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground? A. 100 J
B. 200 J
C. 400 J
D. 600 J

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, sindy35111
Solve the equation for x.3(6x - 1) = 12 i've tried doing the math and i can't find out what i'm doing wrong
Answers: 1
image
Mathematics, 21.06.2019 22:10, tiphannyk
Erinn wrote the equation –5x + 4y = 32 to represent her hourly wage (y) and how this wage has changed during each year that she worked at a company (x). what is the rate of change in erinn's hourly wage per year?
Answers: 2
image
Mathematics, 21.06.2019 23:30, Krazyyykiddd
Xy x xy if a and b are positive integers such that a*b=9 and b*a=72 what is the value of a/b
Answers: 3
image
Mathematics, 22.06.2019 00:00, sakurauchiha913
A6 ounce bottle of dressing costs $1.56 a 14 ounce bottle costs $3.36 a 20 ounce bottle costs $5.60 which has the lowest cost per ounce
Answers: 1
You know the right answer?
What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m...

Questions in other subjects:

Konu
Mathematics, 18.01.2021 21:50
Konu
English, 18.01.2021 21:50