A factory process requires 3 steps to finish a product. The steps each have a mean completion time of A= 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is independent from the other steps. Let T be the total completion time for the 3 steps. Find the standard deviation of T.

Choose 1

OT = 15 seconds

Or = 75 seconds

or 15 seconds

or = v75 seconds

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, williams5847
Chanelle deposits $7,500 into the bank. she does not withdraw or deposit money for 6 years. she earns 6% interest during that time. what will the balance be when she is finally able to withdraw her money?
Answers: 1
image
Mathematics, 21.06.2019 20:30, heyyyyy39
The cost for an uberi is $2.50 plus $2.00 mile. if the total for the uber ride was $32.50, how many miles did the customer travel?
Answers: 3
image
Mathematics, 21.06.2019 21:30, mrlepreqon8897
Apool measures 100 meters by 100 meters a toddler inside the pool and trows a ball 60 centimeters from one edge of the pool. how far is the ball from the opposite edge of the pool
Answers: 1
image
Mathematics, 21.06.2019 21:40, chunkymonkey090
Ihonestly have no clue if it's each or none.
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...

Questions in other subjects:

Konu
Mathematics, 20.08.2020 08:01
Konu
Mathematics, 20.08.2020 08:01
Konu
Mathematics, 20.08.2020 08:01
Konu
History, 20.08.2020 08:01
Konu
Computers and Technology, 20.08.2020 08:01