subject
Mathematics, 03.02.2021 20:50 chaaaa

Q10. It takes 2 painters 4 days to compete a job. How long will it take 1 painter to complete the
same job?
What assumptions have you made?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, lm18618
Jeffery conducted a survey in his school and found that 30 of the 50 eighth grade students' favorite subject is mathematics. based on the results, jeffery concluded that out of the 200 students in his school, 120 students' favorite subject is mathematics. select the statement that is true about jeffery's conclusion. a. jeffery's conclusion is not valid because the sample was biased since only 200 students were surveyed. b. jeffery's conclusion is valid because the sample was random since all of the students were eighth grade students. c. jeffery's conclusion is valid because the sample was random. d. jeffery's conclusion is not valid because the sample was biased since all of the students were eighth grade students.
Answers: 2
image
Mathematics, 21.06.2019 16:20, jennyferluna0216
Refer to interactive solution 17.45 to review a method by which this problem can be solved. the fundamental frequencies of two air columns are the same. column a is open at both ends, while column b is open at only one end. the length of column a is 0.504 m. what is the length of column b?
Answers: 1
image
Mathematics, 22.06.2019 00:00, Lions8457
City l has a temperature of −3 °f. city m has a temperature of −7 °f. use the number line shown to answer the questions: number line from negative 8 to positive 8 in increments of 1 is shown. part a: write an inequality to compare the temperatures of the two cities. (3 points) part b: explain what the inequality means in relation to the positions of these numbers on the number line. (4 points) part c: use the number line to explain which city is warmer. (3 points)
Answers: 2
image
Mathematics, 22.06.2019 00:40, sonyfan
Calculate the effective quarterly compound interest rate equivalent to a 1% of monthly compound interest rate.
Answers: 3
You know the right answer?
Q10. It takes 2 painters 4 days to compete a job. How long will it take 1 painter to complete the

Questions in other subjects:

Konu
History, 18.10.2020 06:01