1. Find a • b.
a = <7, 4>, b = <3, 5>
A. 41
B. <10, 9>
C....
Mathematics, 28.01.2021 14:00 lenniestreet10
1. Find a • b.
a = <7, 4>, b = <3, 5>
A. 41
B. <10, 9>
C. -1
D. <21, 20>
2. Find a • b.
a = 10i + 9j, b = 4i + 3j
A. <40, 27>
B. <14, 12>
C. 67
D. -13
3. Find the angle between the given vectors to the nearest tenth of a degree.
u = <8, 7>, v = <9, 7>
A. -8.3 degrees
B. 1.7 degrees
C. 3.3 degrees
D. 13.3 degrees
4. Determine whether the vectors u and v are parallel, orthogonal, or neither.
u = <10, 6>, v = <9, 5>
A. Orthogonal
B. Parallel
C. Neither
5. Evaluate the expression:
v•w
Given the vectors:
r = <5, -5, 2>; v = <2, -8, -8>; w = <-2, 6, -5>
Answers: 2
Mathematics, 21.06.2019 19:40, mathman783
F(x) = 1/x g(x)=x-4 can you evaluate (g*f)(0) ? why or why not?
Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:10, juliapreciiado
Hello, i need compare km^2 and km. what's difference in this?
Answers: 2
Mathematics, 22.06.2019 00:30, janeou17xn
What is the sum of the geometric series in which a1 = 7, r = 3, and an = 1,701? hint: cap s sub n equals start fraction a sub one left parenthesis one minus r to the power of n end power right parenthesis over one minus r end fraction comma r ≠ 1, where a1 is the first term and r is the common ratio
Answers: 1
Business, 01.02.2021 17:40
Mathematics, 01.02.2021 17:40
Mathematics, 01.02.2021 17:40
English, 01.02.2021 17:40