subject
Mathematics, 27.01.2021 03:30 xxtonixwilsonxx

The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probability distribution for time estimates. Which is NOT one of the three time estimates the model uses to calculate expected completion time?
les)
A)
Optimistic Time
B)
Most Likely Time
Least Likely Time
D)
Pessimistic Time

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, jortizven0001
Seymour is twice as old as cassandra. if 16 is added to cassandra’s age and 16 is subtracted from seymour’s age, their ages become equal. what are their present ages? show !
Answers: 1
image
Mathematics, 21.06.2019 21:50, heavendl13
Which equation shows the quadratic formula used correctly to solve 5x2 + 3x -4 0 for x? cos -3+ v (3) 2-4() 2(5) 3+ |(3)² +4() 205) 3+ (3) 2-4() -3+ v (3)² +4()
Answers: 1
image
Mathematics, 22.06.2019 03:40, 290000992
Ne height of zak is 1.86 metres. the height of fred is 1.6 metres. write the height of zak as a fraction of the height of fred. give your answer in its simplest form.
Answers: 1
image
Mathematics, 22.06.2019 05:30, ashliemallen
The equation of line e is y  =  -4/9x  +  5/6.  line f is parallelto line e.  what is the slope of line f
Answers: 1
You know the right answer?
The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probabilit...

Questions in other subjects:

Konu
Mathematics, 20.09.2019 21:00