If 1800 persons can finish the construction of a building in 40 days , how many persons are required to complete the construction of the building in 24 days?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, saja19
Find the slope of the line below . enter your answer as a fraction or decimal. use a slash mark ( / ) as the fraction bar if necessary
Answers: 3
image
Mathematics, 21.06.2019 17:40, annie1799
The perimeter of a rectangle is greater than or equal to 74 meters. if the length is 25 meters, the minimum width of the rectangle is meters.
Answers: 2
image
Mathematics, 21.06.2019 19:00, Madsissabell
1) in triangle the, what is the measure of angle t (in degrees)? 2) in triangle bat, the measure of angle b is 66∘, and the measure of angle t is 77∘.what is the measure of the exterior angle at a (in degrees)?
Answers: 1
image
Mathematics, 21.06.2019 19:30, kataldaine
Which of the following describes the symmetry of the graph of y = x3?
Answers: 2
You know the right answer?
If 1800 persons can finish the construction of a building in 40 days , how many persons are required...

Questions in other subjects:

Konu
Spanish, 20.10.2019 10:00
Konu
Mathematics, 20.10.2019 10:00
Konu
Physics, 20.10.2019 10:00