subject
Mathematics, 25.01.2021 15:10 xXFLUFFYXx

2. A road 750 metres long is to be resurfaced.
(a)
Workalot say they can resurface it in 23 days.
How many metres is this each day?
Give your answer to the nearest metre.
(b) Roadfill say they can resurface 40 metres of the road each day.
How many days will it take them to do the job?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:40, HomeWorkForLife
The pressure exerted on the walls of a container by a gas enclosed within it is directly proportional to the temperature of the gas. if the pressure is 6 pounds per square inch when the temperature is find the pressure exerted when the temperature of the gas is 380 degrees f show work for the
Answers: 2
image
Mathematics, 21.06.2019 17:30, kruzyoungblood8
When a rectangle is dilated, how do the perimeter and area of the rectangle change?
Answers: 2
image
Mathematics, 21.06.2019 23:40, ggjhuvth
Identify the parent function that can be used to graph the function f(x)=3(x-9)2
Answers: 1
image
Mathematics, 22.06.2019 00:00, onlineK
Zahra runs a 500-meter race at a constant speed. which graph shows her distance from the finish line during the race?
Answers: 1
You know the right answer?
2. A road 750 metres long is to be resurfaced.
(a)
Workalot say they can resurface it i...

Questions in other subjects: