subject
Mathematics, 19.01.2021 02:00 zazy15

Carmella’s Grocery was flooded during a storm. It hired Singh Remodeling and Repair Co. to repair the damage, and six Singh employees were assigned to the task. Because the store wanted to reopen as soon as possible, the repairs were done on a Sunday, and the workers received time-and-a-half pay. Their regular hourly rate is $11.75. The six workers spent 9.5 hours on the project each. How much did Carmella pay Singh?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:30, ashleywoo21361
Assume that y varies inversely with x. if y=1.6 when x=0.5 find x when y=3.2
Answers: 1
image
Mathematics, 22.06.2019 00:30, lazavionadams81
The nth term of a sequence in 2n-1 the nth term of a different sequence is 3n+1 work out 3 numbers that are in bothe sequences and are between 20 and 40
Answers: 2
image
Mathematics, 22.06.2019 02:20, amelvin41
Find the area of the surface obtained by rotating the curve z=4e^2y from y = 0 to y =1 about the y-axis. the area is square units
Answers: 2
image
Mathematics, 22.06.2019 04:30, smokey19
The function c(n) below relates the number of bushels of apples picked at a pick-your-own orchard to the final cost for the apples. it takes as input the number of bushels of apples picked after paying an entry fee to an orchard and returns as output and returns as output the cost of the apples (in dollars)c(n) = 15n + 30which equation below represents the inverse function n(c), which takes the cost of the apples as input and returns the number of bushels picked as output
Answers: 1
You know the right answer?
Carmella’s Grocery was flooded during a storm. It hired Singh Remodeling and Repair Co. to repair th...

Questions in other subjects:

Konu
English, 02.02.2021 01:30
Konu
English, 02.02.2021 01:30
Konu
Mathematics, 02.02.2021 01:30