24 Arbeiter können einen Bauauftrag in 8 Tagen ausführen. Nach zwei Arbeitstagen werden 8 Arbeiter abgezogen. a) Wie lange brauchen die verbliebenen Arbeiter, um die Arbeit zu beenden?
b) Um wie viele Tage verzögert sich der Bauauftrag?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:10, brownzackery71
Girardo is using the model below to solve the equation . girardo uses the following steps: step 1 add 4 negative x-tiles to both sides step 2 add 1 negative unit tile to both sides step 3 the solution is which step could be adjusted so that gerardo's final step results in a positive x-value? in step 1, he should have added 4 positive x-tiles to both sides. in step 1, he should have added 3 negative x-tiles to both sides. in step 2, he should have added 4 negative unit tiles to both sides. in step 2, he should have added 1 positive unit tile to both sides.
Answers: 2
image
Mathematics, 21.06.2019 20:00, janeriaw188
Afamily has five members. a mom, a dad, two sisters, & a brother. the family lines up single file. what is the probabillity that the mom is at the front of the line
Answers: 1
image
Mathematics, 22.06.2019 03:30, hany90
The difference between the measures of two complementary angles is 14. find the measure of both angles.
Answers: 1
image
Mathematics, 22.06.2019 03:50, jamarstand
A11 gram sample of a substance that’s used to treat thyroid disorders has a k-value of 0.1247
Answers: 1
You know the right answer?
24 Arbeiter können einen Bauauftrag in 8 Tagen ausführen. Nach zwei Arbeitstagen werden 8 Arbeiter a...

Questions in other subjects:

Konu
Mathematics, 26.06.2019 16:00
Konu
Mathematics, 26.06.2019 16:00