subject
Mathematics, 09.01.2021 19:00 mehokkj

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 20 child bikes and 6 adult bikes in the week. (2 points) Group of answer choices No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:50, dbn4everloved
What is the equation of the linear function represented by the table?
Answers: 1
image
Mathematics, 21.06.2019 15:10, Mistytrotter
Solve the system by the elimination method. x + y - 6 = 0 x - y - 8 = 0 when you eliminate y , what is the resulting equation? 2x = -14 2x = 14 -2x = 14
Answers: 2
image
Mathematics, 21.06.2019 19:40, love0000
Atextile fiber manufacturer is investigating a new drapery yarn, which the company claims has a mean thread elongation of 12 kilograms with a standard deviation of 0.5 kilograms. the company wishes to test the hypothesis upper h subscript 0 baseline colon mu equals 12 against upper h subscript 1 baseline colon mu less-than 12 using a random sample of n equals 4 specimens. calculate the p-value if the observed statistic is x overbar equals 11.8. round your final answer to five decimal places (e. g. 98.76543).
Answers: 3
image
Mathematics, 21.06.2019 21:00, lollok
If there are 3.281 feet in 1 meter, how many inches are in one centimeter
Answers: 1
You know the right answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Mathematics, 04.09.2020 21:01
Konu
Mathematics, 04.09.2020 21:01
Konu
English, 04.09.2020 21:01
Konu
English, 04.09.2020 21:01
Konu
Computers and Technology, 04.09.2020 21:01