Mathematics, 23.12.2020 17:40 ovaldez5237
if it takes 6 men 4 days to dig a hole 3 meters deep, how long will it take 10 men to dig a hole 7 meters deep? please show how, I'm studying for the final
Answers: 3
Mathematics, 21.06.2019 18:40, banditballer2
Complete the steps, which describe how to find the area of the shaded portion of the circle. find the area of the sector by multiplying the area of the circle by the ratio of the to 360. subtract the area of the triangle from the area of the sector.
Answers: 3
if it takes 6 men 4 days to dig a hole 3 meters deep, how long will it take 10 men to dig a hole 7 m...
Mathematics, 08.11.2020 01:00
Mathematics, 08.11.2020 01:00
History, 08.11.2020 01:00
Mathematics, 08.11.2020 01:00
Mathematics, 08.11.2020 01:00
Chemistry, 08.11.2020 01:00
Biology, 08.11.2020 01:00