Mathematics, 21.12.2020 17:50 GaySpaghetti

You needed a supplier that could provide parts as close to 76.8 inches in length as possible. You receive four contracts, each with a promised level of accuracy in the parts supplied. Which of these four would you be most likely to accept? a) Mean of 76.8 with a 95% confidence interval of 76.6 to 77.0
b) Mean of 76.800 with a 99% confidence interval of 76.5 to 77.1
c) Mean of 76.8 with a 99% confidence interval of 76.6 to 77.0
d) Mean of 76.800 with a 90% confidence interval of 76.6 to 77.0

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, YwnDerek
Which inequality comparing two of the expressions is true when 0.7 < x < 0.9
Answers: 1
image
Mathematics, 21.06.2019 21:00, princeton
Rewrite the following quadratic functions in intercept or factored form. show your work. f(x) = 3x^2 - 12
Answers: 1
image
Mathematics, 21.06.2019 23:00, camiserjai1832
Agroup of three friends order a combo meal which includes two slices of pizza and a drink each drink is priced at $2.50 the combined total of $31.50 how much is the cost of a slice of pizza
Answers: 2
image
Mathematics, 21.06.2019 23:50, zariyastanfield4452
The graph of a curve that passes the vertical line test is a:
Answers: 3
You know the right answer?
You needed a supplier that could provide parts as close to 76.8 inches in length as possible. You re...

Questions in other subjects:

Konu
Mathematics, 23.09.2021 04:30
Konu
Mathematics, 23.09.2021 04:30