Mathematics, 16.12.2020 19:10 alanihuling
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 10 child bikes and 12 adult bikes in a week. (2 points)
No, because the bike order does not meet the restrictions of 40 + 6a s 120 and 40 + 4a s 100
No, because the bike order does not meet the restrictions of 40 + 4a s 120 and 6c + 4a s 100
Yes, because the bike order meets the restrictions of 40 + 6a s 120 and 40 + 4a s 100 O
Yes, because the bike order meets the restrictions of 40 + 4a s 120 and 6c + 4a s 100
Answers: 1
Mathematics, 21.06.2019 14:10, jessicaflower277
Can't gugys answer the ratio question. this is urgent the plans of a building is drawn toward scale of 1: 1000. kfc the foyer on the plans measures 62mm by 54mm, how large is the foyer in real life?
Answers: 1
Mathematics, 21.06.2019 16:00, ctyrector
Asap for seven months an ice creams vendor collects data showing the number of cones sold a day (c) and the degrees above 70 degrees f the vendor finds that there is a positive linear association between c and t that is the best modeled by this equation c=3.7t+98 which statement is true? the model predicts that the average number of cones sold in a day is 3.7 the model predicts that the average number of cones sold i a day is 98 a model predicts that for each additional degree that the high temperature is above 70 degres f the total of number of cones sold increases by 3.7 the model predicts for each additional degree that the high temperature is above 70 degrees f the total number of cones sold increasingly by 98
Answers: 3
Mathematics, 21.06.2019 22:30, dakotaadkins20
Find the area of the region that is inside r=3cos(theta) and outside r=2-cos(theta). sketch the curves.
Answers: 3
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...
Mathematics, 26.10.2019 02:43
History, 26.10.2019 02:43
Biology, 26.10.2019 02:43
Chemistry, 26.10.2019 02:43
Mathematics, 26.10.2019 02:43
Mathematics, 26.10.2019 02:43
Mathematics, 26.10.2019 02:43
Health, 26.10.2019 02:43