subject
Mathematics, 16.12.2020 16:30 sherlyngaspar1p9t3ly

Three art students used a total f 28 1/2 inches of string for an art project each student used 2 1/2 inches of string plus an additional 1 3/4 of string for each day rthey worked on the art project each student worked on the project the same number of days which equation could be used to find d the number of days the students worked on the art project

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, emblemhacks
Me. drysdale earned 906.25 in interest in one year on money that he had deposited in his local bank if the bank paid an interest rate of 6.25% how much money did mr. drysdale deposit
Answers: 3
image
Mathematics, 21.06.2019 14:00, joemoe15jr
Two sides of a triangle mesure 20cm and 30cm. what is the measure of the third side
Answers: 3
image
Mathematics, 21.06.2019 17:00, tifftiff22
The volume of a cube is 8 in to the 3rd power. how long is each side?
Answers: 1
image
Mathematics, 21.06.2019 17:30, davidgarcia522083
Which expression can be used to determine the slope of the line that passes through the points -6, three and one, -9
Answers: 3
You know the right answer?
Three art students used a total f 28 1/2 inches of string for an art project each student used 2 1/2...

Questions in other subjects: