subject
Mathematics, 16.12.2020 01:00 MileenaKitana

Worker A can finish a job in 3 hours. When working at
the same time as Worker
B, they can finish the job in
2 hours. How long does it
take for Worker B to finish
the job if he works alone

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, adrianwoods1507
1c) the number 131 is a term in the sequence defined by the explicit rule f(n)=5n-4. which term in the sequence is 131? 2a) write the first four terms of the function f(n)=n^2-1 2b) what is the 10th term of the sequence defined by the explicit rule f(n)=n^2-1 2c) the number 224 is a term in the sequence defined by the explicit rule f(n)=n^2-1. which term in the sequence is 224?
Answers: 2
image
Mathematics, 21.06.2019 23:30, SmolBeanPotato
If the perimeter of the garden is 37 ft. the width is x and the length is 15 ft. what is the width of the garden in feet?
Answers: 2
image
Mathematics, 22.06.2019 00:30, robloxlover1987
If on=8x-8,lm=7x+4,nm=x-5,and ol=3y-6
Answers: 2
image
Mathematics, 22.06.2019 01:30, nandinipp0303
Robert is placing sod in two square shaped areas of his backyard. one side of the first area is 7.5 feet. one side of the other area is 5.7 feet. the sod costs y dollars per square foot
Answers: 3
You know the right answer?
Worker A can finish a job in 3 hours. When working at
the same time as Worker
B, they c...

Questions in other subjects:

Konu
Social Studies, 01.08.2019 09:00