subject
Mathematics, 12.12.2020 17:10 itsgiovanna

A new process for producing a type of novolac resin is supposed to have a mean cycle time of 3.5 hours per batch. Six batches are produced, and their cycle times, in hours, were 3.45 3.47 3.57 3.52 3.40 3.62. Can you conclude that the mean cycle time is greater than 3.5 hours

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:40, chinnellepug2149
In a certain pentagon, the interior angles are a, b,c, d,e where a, b,c, d,e are integers strictly less than 180. ("strictly less than 180" means they are "less than and not equal to" 180.) if the median of the interior angles is 61 and there is only one mode, then what are the degree measures of all five angles?
Answers: 1
image
Mathematics, 21.06.2019 18:00, Tellyy8104
On a piece of paper, graph y< x+1. then determine which answer matches the graph you drew.
Answers: 2
image
Mathematics, 21.06.2019 19:10, imran2k13
The linear combination method is applied to a system of equations as shown. 4(.25x + .5y = 3.75) → x + 2y = 15 (4x – 8y = 12) → x – 2y = 3 2x = 18 what is the solution of the system of equations? (1,2) (3,9) (5,5) (9,3)
Answers: 1
image
Mathematics, 21.06.2019 22:30, imran2k13
Factor the polynomial by its greatest common monomial factor.
Answers: 1
You know the right answer?
A new process for producing a type of novolac resin is supposed to have a mean cycle time of 3.5 hou...

Questions in other subjects:

Konu
Chemistry, 26.04.2021 15:10
Konu
Mathematics, 26.04.2021 15:10
Konu
Mathematics, 26.04.2021 15:10
Konu
Spanish, 26.04.2021 15:10