Mathematics, 10.12.2020 18:30 lrasanaoaksandfurana
The table represents the temperature of a cup of coffee over time.
A 2-column table with 7 rows. The first column is labeled time (minutes) with entries 0, 10, 20, 30, 40, 50, 60. The second column is labeled temperature (degrees Fahrenheit) with entries 200, 180, 163, 146, 131, 118, 107.
Which model best represents the data set?
exponential, because there is a relatively consistent multiplicative rate of change
exponential, because there is a relatively consistent additive rate of change
linear, because there is a relatively consistent multiplicative rate of change
linear, because there is a relatively consistent additive rate of change
Answers: 1
Mathematics, 21.06.2019 18:30, travorissteele822
The table shows the relationship between the number of cups of cereal and the number of cups of raisins in a cereal bar recipe: number of cups of cereal number of cups of raisins 8 2 12 3 16 4 molly plotted an equivalent ratio as shown on the grid below: a graph is shown. the title of the graph is cereal bars. the horizontal axis label is cereal in cups. the x-axis values are 0, 20, 40, 60, 80,100. the vertical axis label is raisins in cups. the y-axis values are 0, 10, 20, 30, 40, 50. a point is plotted on the ordered pair 40,20. which of these explains why the point molly plotted is incorrect? (a) if the number of cups of cereal is 40, then the number of cups of raisins will be10. (b)if the number of cups of raisins is 40, then the number of cups of cereal will be10. (c) if the number of cups of cereal is 40, then the number of cups of raisins will be 80. (d) if the number of cups of raisins is 40, then the number of cups of cereal will be 80.
Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:50, Yangster9305
Ur environment is very sensitive to the amount of ozone in the upper atmosphere. the level of ozone normally found is 4.04.0 parts/million (ppm). a researcher believes that the current ozone level is not at a normal level. the mean of 2525 samples is 4.44.4 ppm with a standard deviation of 0.80.8. assume the population is normally distributed. a level of significance of 0.020.02 will be used. make the decision to reject or fail to reject the null hypothesis. answer tables
Answers: 3
The table represents the temperature of a cup of coffee over time.
A 2-column table with 7 rows. Th...
Health, 27.11.2019 06:31
History, 27.11.2019 06:31
Mathematics, 27.11.2019 06:31