Mathematics, 10.12.2020 16:50 johnsont8377
Anita is filling a pool with water. Currently, there are 60 gallons of water in the pool, and she is filling the pool at a rate of 50 gallons every 5 minutes. She wants to fill the pool with at least 200 gallons of water. Enter an inequality that represents all possible values for the number of minutes (m) that it will take to fill the pool. $$
Answers: 1
Mathematics, 21.06.2019 20:50, brea2006
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
Mathematics, 22.06.2019 00:30, vladisking888
How can you find the magnitude of a vector, v = < x, y > , where the horizontal change is x and the vertical change is y?
Answers: 1
Mathematics, 22.06.2019 03:00, tatilynnsoto17
I’m how many different ways can she give the four remaining flowers to the rest of the teachers in the afternoon
Answers: 2
Anita is filling a pool with water. Currently, there are 60 gallons of water in the pool, and she is...
Computers and Technology, 23.01.2021 14:00
Mathematics, 23.01.2021 14:00
Mathematics, 23.01.2021 14:00
English, 23.01.2021 14:00
French, 23.01.2021 14:00
History, 23.01.2021 14:00
Mathematics, 23.01.2021 14:00