subject
Mathematics, 09.12.2020 02:10 s1027

Machine A produces 75 fishing lures per minute. Machine B produces 50 of the same lure per minute. How long will it take both machines running to produce 2100 fishing lures? A - 14.4
B - 16.8
C - 18.2
D - 20.7

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, cupcakes5335
#1-20 state whether the angles are alternate interior, alternate exterior, vertical, or corresponding angles.
Answers: 2
image
Mathematics, 21.06.2019 18:00, pstat
What is the rate of change of a line that passes through (2,-5) and (6,-2)?
Answers: 2
image
Mathematics, 21.06.2019 19:00, dnarioproctor
Solve for n? [tex]z = \frac{3}{4} mn[/tex]
Answers: 1
image
Mathematics, 21.06.2019 21:30, peytonamandac9114
Ahypothesis is: a the average squared deviations about the mean of a distribution of values b) an empirically testable statement that is an unproven supposition developed in order to explain phenomena a statement that asserts the status quo; that is, any change from what has been c) thought to be true is due to random sampling order da statement that is the opposite of the null hypothesis e) the error made by rejecting the null hypothesis when it is true
Answers: 2
You know the right answer?
Machine A produces 75 fishing lures per minute. Machine B produces 50 of the same lure per minute. H...

Questions in other subjects:

Konu
Mathematics, 17.10.2021 14:00