subject
Mathematics, 01.12.2020 20:30 inneedofhelp6237

An engineering company was hired to dig an underground tunnel directly from point A to point B, which was the distance of 1.4 miles. By mistake, however, they tunneled from point A to point C. then they tunneled from point C to point B. If tunneling costs about $120 million per mile, about how much money was wasted? show how you found your answer. (Note: 1 mile= 5,280 feet.)

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:50, twitter505567
How do i simply this expression (quadratic formula basis) on a ti-84 or normal calculator?
Answers: 3
image
Mathematics, 22.06.2019 01:30, deonharris18
Henry's butcher shop uses an electronic scale that measures to 1/100 of a pound. which is the most accurate measurement based on the limitations of the scale that might be found on a package of meat sold by henry?
Answers: 2
image
Mathematics, 22.06.2019 02:00, ashk6614
Use long division to indentify (12xto the second power+15x-8)divided by 3x
Answers: 2
image
Mathematics, 22.06.2019 02:30, kiwipup16
Paper plates cost $8 per package and plastic utensils cost $5 per package. your supplier delivers 15 packages for a total cost of $90.
Answers: 1
You know the right answer?
An engineering company was hired to dig an underground tunnel directly from point A to point B, whic...

Questions in other subjects:

Konu
Mathematics, 29.10.2020 03:30
Konu
Social Studies, 29.10.2020 03:30
Konu
Mathematics, 29.10.2020 03:30
Konu
Mathematics, 29.10.2020 03:30