subject
Mathematics, 18.11.2020 20:30 jlmn5953

An asphalt paving crew is used to pave a 500-foot by 300-foot parking lot. The parking lot will be paved in 12-foot-wide strips running the long (500-foot) direction. The machine paves 11 lineal feet of 12-foot-wide parking lot per minute. A single lift of asphalt will be used on the parking lot. After completing a pass, it takes the crew 10 minutes to turn the paving machine around and get ready for the next pass. The crew consists of a foreperson, six operators, and a laborer. Using a system efficiency of 50 minutes per hour, determine the number of labor hours required to place 1 lineal foot of parking lot 12 feet wide.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, starfox5454
4+6x-3x^3 in standard form with explanations because i don’t understand
Answers: 1
image
Mathematics, 21.06.2019 21:00, sjackson0625p8w1a0
Me! i will mark you brainliest if you are right and show your i don't get polynomials and all the other stuff. multiply and simplify.2x(^2)y(^3)z(^2) · 4xy(^4)x(^2)show your
Answers: 2
image
Mathematics, 22.06.2019 01:20, dominikbatt
Which of the following shows the graph of y=2e^x?
Answers: 2
image
Mathematics, 22.06.2019 01:30, paulethjara
When solving a logarithm equation, how do you find the missing variable ?
Answers: 2
You know the right answer?
An asphalt paving crew is used to pave a 500-foot by 300-foot parking lot. The parking lot will be p...

Questions in other subjects:

Konu
Mathematics, 21.08.2021 14:00
Konu
Physics, 21.08.2021 14:00
Konu
Chemistry, 21.08.2021 14:00