Linear Programming Project Problems: Problem 1
You have been hired as a consultant for Dickory Clock Works to give them advice on how to maximize their rating. Their factory produces
ticks and tocks takes 30 man-hours per dozen ticks and 10 man-hours per dozen tocks. No more than 1500 man-hours of production time
are available each week. Raw materials cost $10 per dozen ticks and $40 per dozen tocks. The budget for raw materials is $1600 per
week. The business receives a rating of 5 per dozen tocks and a rating of 7 per dozen ticks. What advice would you give to the board of
Dickory Clock Works?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, Alexishp33
What is the length of the unknown leg in the right triangle ?
Answers: 2
image
Mathematics, 21.06.2019 18:50, brooke0713
Expresa commuter train leaves downtown sation and travels at a average speed of 55 miles per hour towards the north side sation, which is 50miles away. thirty minutes later, express commuter train #7 leaves north side and travels at a average speed of 35miles per hour towards downtown sation. at the moment the two trains pass each other, how far(in miles) is train #12 from the downtown sation and how long(in minutes) has the #12 train been traveling
Answers: 1
image
Mathematics, 21.06.2019 20:00, carligreen090
Leslie started last week with $1200 in her checking account. during the week, she wrote the checks below.
Answers: 1
image
Mathematics, 21.06.2019 22:00, sascsl2743
Determine if the equation defines y as a function of x: 2xy = 1. yes o no
Answers: 2
You know the right answer?
Linear Programming Project Problems: Problem 1
You have been hired as a consultant for Dickor...

Questions in other subjects:

Konu
Medicine, 13.02.2021 22:30
Konu
Biology, 13.02.2021 22:30
Konu
German, 13.02.2021 22:30