subject
Mathematics, 02.11.2020 18:20 jakhunter354

A building contractor estimated the cost of construction on a house would be between $235,000 and $297,000. He has already spent $164,000. How much more can he spend and remain within his budget?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, allicat133
Awater holding tank measures 105 m long, 50 m wide, and 8 m deep. traces of mercury have been found in the tank, with a concen- tration of 60 mg/l. what is the total mass of mercury in the tank? answer in units of kg.
Answers: 1
image
Mathematics, 21.06.2019 23:30, saintsfan2004
Arestaurant added a new outdoor section that was 8 feet wide and 6 feet long. what is the area of their new outdoor section
Answers: 1
image
Mathematics, 22.06.2019 00:00, mahagonylyric
Solve 13 + w/7= -18 (w/7 is a fraction)
Answers: 2
image
Mathematics, 22.06.2019 00:30, brittsterrr
When you flip a biased coin the probability of getting a tail is 0.6. how many times would you expect to get tails if you flip the coin 320 times?
Answers: 1
You know the right answer?
A building contractor estimated the cost of construction on a house would be between $235,000 and $2...

Questions in other subjects:

Konu
Mathematics, 02.12.2020 19:00
Konu
Mathematics, 02.12.2020 19:00
Konu
Mathematics, 02.12.2020 19:00
Konu
History, 02.12.2020 19:00
Konu
Social Studies, 02.12.2020 19:00