Mathematics, 31.10.2020 14:00 bluenblonderw
At an activity level of 8,800 units, Pember Corporation's total variable cost is $146,520 and its total fixed cost is $219,296. For the activity level of 8,900 units, compute the following values.
Required:
The total variable cost
The total cost
The average variable cost per unit
The average fixed cost per unit
The average total cost per unit
Note: Assume that the activity level is within the relevant range.
Answers: 1
Mathematics, 21.06.2019 15:00, yyyyyyyyy8938
Sienna planned a trapezoid-shaped garden, as shown in the drawing below. she decides to change the length of the top of the trapezoid-shaped garden from 32 ft to 24 ft. which expression finds the change in the scale factor?
Answers: 1
Mathematics, 21.06.2019 18:10, mayamcmillan11
An initial investment of $100 is now valued at $150. the annual interest rate is 5%, compounded continuously. the equation 100e0.05t = 150 represents the situation, where t is the number of years the money has been invested. about how long has the money been invested? use your calculator and round to the nearest whole number. years
Answers: 3
Mathematics, 21.06.2019 19:30, Animallover100
Write the sine and cosine values of a, b, respectively, in the figure for (1) and (2) + explanation.
Answers: 1
Mathematics, 21.06.2019 23:20, IDONTHAVEABRAIN
Which expression is the factorization of x^2+10+21
Answers: 3
At an activity level of 8,800 units, Pember Corporation's total variable cost is $146,520 and its to...
Biology, 30.06.2019 19:00
Chemistry, 30.06.2019 19:00
History, 30.06.2019 19:00
History, 30.06.2019 19:00
Mathematics, 30.06.2019 19:00
Mathematics, 30.06.2019 19:00