A company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor needs 10 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, bailey1025
5× 1/2 = ? a) more than 5 because you are multiplying by a whole number b) 5/10 because you multiply the numerator and denominator by 5 c) less than 5 because you are multiplying by a number that is more than 1 d) less than 5 because you are multiplying by a number that is less than 1
Answers: 3
image
Mathematics, 21.06.2019 18:00, mdlemuslopez
The graph shown is the graph of which function?
Answers: 2
image
Mathematics, 21.06.2019 23:40, madisonromney2819
Which of the following is best modeled using a linear equation y=ax+b, where a is less than 0?
Answers: 2
image
Mathematics, 22.06.2019 01:00, vanenav2003ovf1lz
Drag statements and reasons to each row to show why the slope of the line between d and e is the same as the slope between e and f, given that triangles a and b are similar.
Answers: 2
You know the right answer?
A company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor...

Questions in other subjects:

Konu
Mathematics, 13.10.2019 00:50
Konu
Mathematics, 13.10.2019 00:50