An engineering company was hired to dig an underground tunnel directly from point A to point B, which was a distance of 1.4 miles. By mistake, however, they
tunneled from point A to point C. Then they tunneled from point C to point B. If
tunneling costs about $120 million per mile, about how much money was wasted?
Show how you found your answer. (Note: 1 mile = 5,280 feet)

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, gabrielaaaa1323
At the olympic games, many events have several rounds of competition. one of these events is the men's 100-meter backstroke. the upper dot plot shows the times (in seconds) of the top 8 finishers in the final round of the 2012 olympics. the lower dot plot shows the times of the same 8 swimmers, but in the semifinal round. which pieces of information can be gathered from these dot plots? (remember that lower swim times are faster.) choose all answers that apply: a: the swimmers had faster times on average in the final round. b: the times in the final round vary noticeably more than the times in the semifinal round. c: none of the above.
Answers: 2
image
Mathematics, 21.06.2019 23:10, roxannaemigdio3850
Point s lies between points r and t on . if rt is 10 centimeters long, what is st? 2 centimeters 4 centimeters 6 centimeters 8 centimeters
Answers: 2
image
Mathematics, 22.06.2019 00:00, dcwills17
The equation of line wx is y=2x-5. write an equation of a line perpendicular to line wx in slopeintercept form the contains points (-1,-2)
Answers: 2
image
Mathematics, 22.06.2019 00:20, HelenKellerwasaSlutt
What is the value for this expression? 2e-5
Answers: 1
You know the right answer?
An engineering company was hired to dig an underground tunnel directly from point A to point B, whi...

Questions in other subjects:

Konu
Mathematics, 12.12.2020 23:50
Konu
Mathematics, 12.12.2020 23:50